Coordination scope
Our independent China sourcing service coordinates supplier matching, quotation comparison, samples, inspection arrangements, consolidation and export documents. The process follows site criteria, envelope choice, proposed inspection checkpoints and a shipment plan. It is not a promise that a local building official will stamp a drawing that has not been checked against that official’s code.
Buyers often ask whether a 50 mm wall and a 0.50 kPa wind load can be copied from a previous house. They can be the starting row. They cannot travel to a new seismic design category without a recalculation. The table splits the residential scope into items the shortlisted supplier should document and items the destination still controls.
Welded frames keep more stiffness from the jig and consume more container volume. Bolted knock-down frames raise the 40HQ count, sometimes into the 4–8 empty-shell range, and they move the accuracy problem to site torque. We request comparable supplier pricing for both options. The brief has to say which constraint is tighter: crane day or freight cube.
Use, quantity, country, plan size, storeys, wind, snow, seismic note, interior scope, delivery window and destination port. A 2 storey prefab house and a 1 bed cabin can share this form. They cannot share a silent assumption about the foundation.
The selected supplier should release steel only after the basis sheet is signed. Changes to a 3 bed partition after that date are a variation. ISO 9001 describes how that sheet is stored. It is not a structural code approval and it is not an IBC, Eurocode or NCC permit.
A third-party inspector or supplier team can measure the opening unit for length, diagonal and opening size before the batch runs. On a 60-unit resettlement row that check is what keeps the tenth house from drifting away from the second.
Empty panel cassettes and finished volumetric rooms do not share a stuffing diagram. Sanitary pods reduce the count per 40HQ. The plan marks weight, centre of gravity and which lifting points are certified for that module, not for a shipping container that merely looks similar.
Installation support is project-based. The note covers pad levels, bolt groups, panel joints and the order of roof sheets. It does not replace a local crane contractor or a licensed electrician.
The form below is the same project brief used across the site. On this page it sits in a single column under the gate list so a coordinator can attach the missing load data without hunting through a brochure.