Project desk
Leisure Homes is an independent China sourcing and procurement coordinator, not the original brand official site or an authorized distributor. Our desk reviews written inquiries on business days. A useful note names the house use, the count, the country, the plan size, the storeys, the climate loads, the interior scope, the delivery window and the destination port. Price talk starts after those lines exist.
A relocatable classification can shorten a camp programme because the house may move, yet the authority can still ask for anchors, fire strategy and an energy note for the months it stands. A permanent classification usually adds a fuller foundation design and a longer service-life assumption, and it is the path most lenders recognise. Write which label the local office is using. The desk will not describe a permit as already granted.
Envelope choice belongs in the same note. EPS and PIR stay lighter and often post a lower U-value at 50 or 75 mm, while the fire file still has to be read at the joint and the window, not from the core alone. Mineral wool adds mass and usually carries a stronger system fire discussion, which changes the lifting-point load and the container loading plan. If you have not chosen, say whether freight cube or the fire strategy is the tighter constraint.
This block sits under the map on a light band, full page width, because a residential brief is longer than a pop-up note. The same fields are used. Write the loads in the message box: for example a 1.5 kPa roof load, a 0.50 kPa wind load, or a 45 m/s speed if that is what the engineer issued. Add whether the wall discussion is 50 mm, 75 mm or 100 mm, and whether the core under review is EPS, PIR or mineral wool.
Our sourcing reply separates three questions: what can be frozen from the numbers you sent, what is still a site variable, and which document will be attached. The selected supplier cannot prepare reliable shop drawings from a floor-plan image alone. If the house is a 2 storey stack, say whether the stair is inside a volumetric module or built on site between panelized cassettes. Those two routes change quoted production time and site installation planning. A single-storey 16x40 ft shell is a different packing drawing from a 3 bed lodge made of several rooms.
Phone calls are for clarifying a file that is already in the inbox. They do not replace the written basis. If a previous quotation exists, include its revision date so the new note is compared with that sheet rather than with a generic catalog page. Messages received outside business hours are reviewed on the next business day.